2021 Road Rehabilitation Project

In an ongoing effort to maintain the road network in Corte Madera, Public Works will be resurfacing various roadways on the east side of Town which are listed below. Work will include installing ADA curb ramps, improving drainage and making repairs to the storm system, installing new signage, refreshing striping, and other related work.

The Sanitary District No. 2 recently completed the 2020 Sewer Rehabilitation Project which replaced sewer mains and lower laterals in Marina Village and various other streets. The Town will now be resurfacing those roads as part of the 2021 Road Rehabilitation Project. 

The project will include the following roads:

  • Harbor Drive
  • Echo Avenue
  • Yolo Street
  • Edgemar Way
  • Channel Drive
  • Baja Court
  • Pacific Queen Passage
  • Flying Cloud Course
  • Madera Del Presidio
  • Meadow Ridge Drive
  • Ridge Court
  • Paradise Drive from San Clemente Drive to Seawolf Passage

This project is part of the Town’s ongoing efforts to rehabilitate the Sanitary District’s aging sewer infrastructure while also maintaining Town roadways.

Status: Design

Project Type(s): Roadway, Storm System, Pedestrian, Traffic

Construction Schedule: Construction is anticipated to begin in July 2021. Check back on the website for a more detailed schedule in July. If you have further questions regarding this work, please contact Chris Good at (415) 927-5794 or cgood@tcmmail.org.